Service

Why choose KENDAI

Project application and negotiation

We can provide various application and negotiation assistance services to provincial and park governments.

We have extensive experience and contacts with local governments, and are able to provide the most advantageous negotiation support services for the project.

From the client's point of view, we strategically lead all types of design and construction-related applications.

We will take into account all kinds of local standards.

Construction management mode

We implement a fully Japanese turnkey management.

Our engineering supervisors with active Japanese EPC experience perform comprehensive project management and on-site management.

We adopt Q、C、D、S、E for comprehensive management.

We adopt international quality management to ensure the quality of construction.

We prepare the construction plan with due consideration for the neighborhood environment.

Material equipment selection

We use excellent quality electrical equipment

We design and construct with advanced crisis management awareness, and can provide the most reassuring service to customers and residents.

Strictly control all kinds of materials and construction processes to ensure the quality of construction and the safe use of customers in the future.

We will take into account all kinds of local standards.

The production of construction drawings

As part of our quality control, we produce a full set of construction drawings.

The company's professional design department produces a full set of detailed on-site construction drawings for interiors, doors and windows, and bodies.

Construction drawings are drawn according to the Japanese process.

The results of full communication with the designer will be fully reflected in the construction drawings.

Make on-site construction drawings on the premise of fully considering the on-site construction sequence.

After making the construction drawings, manage the site according to this, and realize the drawings.

Integrate all architectural, electrical, and equipment contents on the drawings.

Construction Drawing Production

Handover and after-sales service

We strictly adhere to the construction deadline, carry out the completion handover and provide all kinds of quality assurance and after-sales service.

At the time of handover, a full set of dossiers will be handed over to the owner and the after-sales responsibility for each project will be clarified. And will establish after-sales responsibility.

A memorandum of understanding was signed with the customer at the time of completion and handover to clarify the division of responsibilities and after-sales maintenance for each project.

Handover and after-sales service

Emergency contact system

we have an emergency contact system during construction and after handover

Construction quality management

Implement total quality management and build a better future!

Period Item implemented Specific contents and purposes
Preparation stage Symposium before commencement of construction

Before commencement of works, departments of design, equipment and architecture will conduct symposium on construction, quality and safety.

The symposium will focus on drawing discussion, inspecting whether construction and installation method comply with Chinese and Japanese standards, and will grasp requirements of customers, implement key quality management works, so as to ensure quality requirement to be met.

Commencement of construction Inspection before structure construction

Track the contents of symposium, reconfirm the engineering, structure and purchase plan and temporary plan. On the basis of construction management schedule of China GB and our company, guarantee quality management system function in the period

Construction Structure upper beam inspection

It is simultaneous with structure construction inspection.

Seriously implement beforehand inspection system.

Intermediate inspection

In the middle stage of project, confirmation of construction management condition and quality shall be done, so as to identify problems in advance and prevent quality complaint after construction completion from happening

Completion of works Completion inspection

The completion inspection will be conducted by architectural and equipment personnel themselves.

Easy cleaning and repairability shall be considered in inspection, so as to repair and maintain to improve quality in advance

Delivery Project examination meeting

Project examination meeting will be held, where good practice shall be promoted in the company, and assurance system and construction attention shall be handed over and confirmed

Construction safety management

daily security management cycle (security cycle twice a year).

Weekly security patrols and inspections

The inspection of the director and team leader

The inspection of the tool

The implementation of the project department safety study meeting

Subcontracted study session

Employee learning session

Conduct safety meetings (1 per day).

Regular safety meeting of the project department

Regular safety meeting of the project department